Blason de la République Gabonaise
Gabonese Republic
CNEE Logo
Professional Services

Services to Local Authorities

Complete support for town halls and departmental councils in managing their energy consumption and public infrastructure

Guaranteed Service
Fast Processing
Secure
100%
Coverage
Of water and electricity bills
6
Steps
In the request procedure
9
Provinces
Covered by our services
24/7
Support
Permanent availability

About Our Services

CNEE ensures on behalf of the State the execution of public service related to the management of public water networks (water fountain, urban hydraulic drilling, rural hydraulic drilling), the management of public lighting networks (streetlight, high mast, traffic lights) and covers water and electricity consumption expenses for public buildings of local authorities (town halls and departmental councils).

Our Recovery and Control Directorate is responsible for relations with the GABON Energy and Water Company (SEEG) and local authorities (town halls, departmental councils).

Our Services

Complete solutions to meet all your energy management and public infrastructure needs

Bill Coverage

CNEE covers water and electricity consumption expenses for public buildings of local authorities (town halls and departmental councils). These expenses are financed by the special funds for water and electricity.

  • Payment of water bills for administrative buildings
  • Payment of electricity bills for administrative buildings
  • Financing through special funds for water and electricity
  • Monitoring and control of consumption

Meter Installation

CNEE facilitates the installation of new meters for town halls and local authorities. We manage the entire request, installation and commissioning procedure.

  • Official request to the General Directorate
  • Technical and legal analysis
  • Coordination with SEEG
  • Installation and commissioning

Technical Support

CNEE provides technical support to local authorities in the operation of electrification and hydraulic works. We also proceed with arbitrations regarding network extensions.

  • Operation of electrification works
  • Operation of hydraulic works
  • Arbitration on network extensions
  • Maintenance and extension programs

Control and Recovery

The Recovery and Control Directorate verifies levies, irregularities, fraud and abuse of consumption by local authorities. It agrees on documents relating to the collection of special contributions.

  • Verification of special contribution levies
  • Billing control and detection of irregularities
  • Detection of fraud and abuse of consumption
  • Verification of billing of contracts subscribed by municipalities
  • Compensation with consumption bills of town halls and departmental assemblies
  • Verification of debt for contributions not reimbursed by SEEG
  • Control missions across all provinces

Meter Request Procedure

A simple and transparent 6-step process to request the installation of a new meter

1

Initial Request

The town hall or local authority submits an official request to the CNEE General Directorate for the installation and coverage of a new meter.

2

Request Processing

The Recovery and Control Directorate receives the request for technical and legal analysis.

3

Approval and Transmission

After obtaining a favorable opinion from the General Directorate, CNEE transmits the request to the Gabon Energy and Water Company (SEEG) to organize the meter installation.

4

Quote and Contract

SEEG establishes a quote for the work, sent for CNEE validation. Then a subscription contract is established and signed by the CNEE General Directorate.

5

Installation and Integration

SEEG performs a provisional reception of the installations and proceeds with the meter installation, followed by the commissioning of the connection necessary for the building. Meanwhile, CNEE integrates the information relating to the new meter into its accounting records.

6

Commissioning and Delivery

Once the meter is operational, CNEE ensures the official delivery of the meter to the town hall or authority which can use it under CNEE supervision.

Need Help?

Contact us for any questions regarding our services to local authorities

Recovery and Control Directorate

This directorate is responsible for relations with SEEG and local authorities (town halls, departmental councils). Its purpose is to optimize the management of energy consumption of public administrative buildings, to control billing and recovery of receivables from our main partner which is SEEG.

Main Missions:

  • Ensure direct link with SEEG services
  • Verify special contribution levies
  • Verify billing of contracts subscribed by municipalities
  • Determine for each local authority the amount of consumption expenses covered
  • Inventory extension needs for public lighting networks
  • Follow up on requests from local authorities
  • Carry out control missions across all provinces

Contact Information

Address:

Avenue Paul MOUKAMBI, Haut de Gué-Gué, Libreville

Hours:

Monday - Friday, 7:30 AM - 3:30 PM